Pulsar Helium Inc. (TSXV: PLSR & FRA: Y3K) announced that drilling the Jetstream #1 appraisal well at the Topaz helium project is anticipated to commence on February 2nd, 2024.
Drilling is anticipated to be completed within one month with flow testing to commence immediately following
demobilisation.
Capstar will provide a 6000 Elenburg Manufacturing trailer-mounted drilling rig to drill the Jetstream #1 appraisal well at Topaz. Mobilization is anticipated to be completed by January 28th with drilling to commence on February 2nd. All required permits have been received and site preparation is complete.
Jetstream #1 will be drilled to a depth of 686m (2,250ft) with contingency in place to extend to 762m (2,500ft). A mass spectrometer will be onsite providing gas composition every 100 seconds with gas samples to be collected when zones of helium gas response are encountered. Upon reaching total depth, a comprehensive suite of open hole wireline logs will be acquired by Baker Hughes. Following the wireline data acquisition, the well will be completed and the rig will be released and demobilised. A well testing package will then mobilise and rig up on the Jetstream #1 well and execute a flow testing and pressure build-up program, and collect pressurised gas sample data.
Listen On
Also Listen
-
Zak Mir talks to Rick Guiney, CEO of MicroSalt (AIM:SALT)
Zak Mir talks to Rick Guiney, CEO MicroSalt, after several recent bulk orders th -
Zak Mir talked to David Minchin, Chairman Helix Exploration
Today marked a pivotal moment for Helix Exploration as they announced a signific -
Zak Mir talks to Graham Lyon, Executive Chairman, Sound Energy
Zak Mir talks to Graham Lyon, Executive Chairman, Sound Energy as the transition -
HeLIX Exploration PLC Chairman David Minchin talking with Zak Mir
Zak Mir talks to David Minchin, Chairman Helix Exploration in the wake of the la